KITCHEN TIMELINE

8/15/2020

Comments

 
Picture
Are you looking to have your Kitchen completely renovated in time for your holiday parties this December? If so, it's already time to start planning! Yes, we know, it's entirely possible that our "parties" may look different this year, but even if we don't have our houses filled, it would be a treat to have them finished, wouldn't it? Below we discuss the timeline of major steps that need to be completed.

​If you're not much of a reader, the cliff notes/coles notes version of this post is this:
If you want your Kitchen complete by December 21st, you need to order your cabinets by Sept. 11th, which means you want to start the design process no later than August 21st. 

​
THE BEST WAY TO DO A TIMELINE IS TO REVERSE ENGINEER IT! 

We are basing the following dates off of celebrations happening on Monday December 21st or later, allowing you to clean and set up for your get-together on the weekend. If your family plans to celebrate earlier than the 21st, then these deadlines would need to be earlier as well. These are all absolute deadlines. Obviously, it's always better to start earlier to avoid stress and allow for more time to clean and decorate after the renovation is complete. 

This is to be used as a guideline to keep you on track, providing that you are using trusted professional trades to accomplish each step.

FINALS:
ELECTRICAL, TOUCH-UPS ETC: December 16th - 18th
BACKSPLASH INSTALL: December 14th-16th

COUNTERTOP:
CAMBRIA (COUNTERTOP) MUST INSTALL BY: December 11th
CAMBRIA (COUNTERTOP) MUST TEMPLATE BY: November 25th (Cambria in Windsor-Essex County typically has 2 weeks and 2 days as their lead time during the holidays. Check with your countertop supplier for their lead time and adjust accordingly)

CABINETRY:
CABINETRY INSTALLED: November 23th-27th (Bases installed first to allow for countertop template.)
CABINETRY DELIVERED BY: November 20th
CABINETRY ORDERED BY: September 11th (From the time you sign the purchase agreement to the time the cabinets arrive in your home you are looking at a 10 week lead time, especially during the rush of the Holidays.)

Note: These are the major deadlines, make sure that your Kitchen team is also scheduling the rest of the trades (flooring, painting, electrical, plumbing etc.) accordingly.


Picture

​Mom and I are looking forward to working with you on your new Kitchen project. Whether you are looking for strictly Kitchen Design services or you are also interested in our non-toxic wood or metal cabinets, we are here to help you! If you live anywhere between Amherstburg, ON and Ajax, ON we can set up an appointment to visit you at your home! Our masks are ready! If you live out of that area, in America or across the ocean, we can setup a Zoom meeting to get introduced! Either way, we can't wait to learn more about your exciting new project! 
Picture
Comments

    CATEGORIES

    All
    CAMBRIA QUARTZ
    KITCHEN INDUSTRY
    KITCHENS
    OUR COMMUNITY
    OUTDOOR KITCHENS
    WELLNESS DESIGN

    RSS Feed


Picture
WE DESIGN FOR YOU!
​INDOOR | OUTDOOR | COMMERCIAL

Kitchens Designed in Canada,  Loved Across The World
Stay Connected:

Kitchen Inspiration Right To Your Inbox: (Subscribe Here)

© 2024 The Cabinet Studio (Canada) Inc. All Rights Reserved
  • WORK WITH US
    • Meet Your Designers
    • Let's Discuss Your Kitchen
    • Our Clients Words
  • ECO-LUXE KITCHENS
    • Metal Cabinetry
    • Wood Cabinetry
    • Cambria Countertops
    • Photos/Videos >
      • Kitchen Cabinetry Projects
      • Accessories & Inserts
      • Kitchen Video Series
  • Crohn's
  • "We Design For You" Blog
  • CONTACT